Almost every buyer in Navi Mumbai faces this choice. Under-construction flats in Ulwe, Panvel or Kharghar come with a lower price and a long list of payment plans. Ready flats cost more upfront, but you get the keys now. On paper the cheaper option looks obvious. In practice it often isn't.
The short answer
- Buy ready to move if you're paying rent today, need the home soon, want rental income straight away, or simply don't want any delivery risk.
- Buy under construction if you already have a home, can wait three or four years, and are buying from a developer with a strong record of delivering on time.
- GST on ready flats (with OC)
- 0%
- GST on under-construction flats
- 5%1% if affordable: up to ₹45 lakh and 60 sq m
- Typical premium for ready homes
- 8–10%
- Share of sales that are ready homes
- ~60%top 7 cities, 2025 (Anarock)
Side by side
| Ready to move | Under construction | |
|---|---|---|
| Price | Higher, usually by 8–10% | Lower, and you can lock in today's rate |
| GST | None once the OC is issued | 5% of the price (1% if affordable) |
| When you move in | Now | Typically 3–5 years, and delays happen |
| What you see | The actual flat, view, light, neighbours, society | A sample flat and a brochure |
| Risk | Low. Check the OC and the society. | Delay, plan changes or a stalled project |
| Cash flow | Full payment upfront, rent saved or earned from day one | Paid in stages; you may pay rent and loan interest together |
| Choice of unit | Whatever is left | Best floors, views and layouts, if you book early |
What the discount is really worth
Take a flat that sells for ₹1.5 crore ready, and a similar one in an under-construction project 8% cheaper, at ₹1.38 crore. Here's what each actually costs in Navi Mumbai, where stamp duty is 7%:
- Ready: ₹1.5 crore + ₹10.8 lakh stamp duty and registration = about ₹1.61 crore.
- Under construction, if you already have a home: ₹1.38 crore + ₹6.9 lakh GST + ₹9.96 lakh stamp duty and registration = about ₹1.55 crore, a saving of around ₹5.9 lakh.
- Under construction, if you rent while you wait: add three years of rent at ₹40,000 a month (₹14.4 lakh) and it comes to about ₹1.69 crore, around ₹8.5 lakh more than the ready flat.
And that's assuming the project finishes on time. Every extra year of delay adds another year of rent, and every month you can't move in is a month of rental income you don't earn.
Why delays matter in Maharashtra
Delays aren't rare. In May 2026, MahaRERA issued show-cause notices to 8,212 of the state's 33,029 ongoing housing projects for failing to file their quarterly progress reports on time. More than half of those, 4,644, were in the Mumbai region and Konkan. A missed report doesn't always mean a delayed building, but it's a warning sign worth checking before you book.
My view: In Navi Mumbai today, ready flats are the better buy for most end-users, because the GST and rent you save usually wipe out the under-construction discount. Under-construction makes sense for investors with time on their side, buying early in a strong location like the airport belt from a developer who has delivered on time before. Then the early price and choice of unit are worth the wait.
What to check: ready-to-move flats
- The full Occupancy Certificate. It's issued by NMMC, CIDCO or Panvel Municipal Corporation, depending on the location. Make sure it covers your building and floor. A "part OC" for some floors is not the same thing.
- The MahaRERA page. Check that the project shows as completed and that the OC is uploaded.
- Society and maintenance. Has the society been formed? What's the monthly maintenance, and are there any pending dues on the flat?
- The flat itself. Visit in daylight and after rain. Check for seepage, water supply and lift condition, and the parking actually allotted to you.
What to check: under-construction flats
- MahaRERA registration and progress. Confirm the project is registered, and check that its quarterly progress reports are up to date.
- The developer's record. Visit their past projects and compare the promised possession dates with when buyers actually moved in.
- The possession date in your agreement. Note the date and any grace period, and what compensation the agreement gives for delay.
- A construction-linked payment plan. Pay as the building rises, not mostly upfront.
- Selling another property to buy this one? Capital gains exemptions come with deadlines for completing the new home, and a delayed possession can put them at risk. Check with your CA before you book.
In Navi Mumbai, most new under-construction supply is in Ulwe, Panvel, Kharghar and the airport belt. Ready options are easier to find in Kharghar, Seawoods, Nerul and Vashi, including near-new resale flats. For more on how those areas compare, read what the new airport changes for Navi Mumbai buyers. To work out your stamp duty, use the stamp duty calculator. If you're weighing a specific ready or under-construction flat, request a consultation and I'll tell you what I'd check.
Sources
- GST rates on housing in 2026, Bajaj Finserv (5% and 1% on under-construction, zero with OC)
- GST on under-construction property, Busy (affordable housing criteria: ₹45 lakh, 60 sq m in metros)
- Why Indian homebuyers are choosing ready homes, Realty+ (ready homes ~60% of 2025 transactions, 8–10% premium, citing Anarock)
- MahaRERA issues show-cause notices to 8,212 housing projects, GeoSquare, May 2026
- MahaRERA suspends 4,812 housing projects, The Realty Today
- Google Trends, India, Real Estate category, past 30 days ("ready to move flats in navi mumbai": Breakout)
This article is general information, not legal, tax or investment advice. The cost example is an illustration; check the actual prices, approvals and your tax position before deciding.